Date |
Hours |
Item Worked on |
Notes |
11/8/95 |
1.00 |
Bill of Materials |
|
11/9/95 |
1.50 |
Bill of Materials |
|
11/10/95 |
2.00 |
Bill of Materials |
|
11/11/95 |
2.00 |
Bill of Materials |
|
11/12/95 |
1.50 |
Bill of Materials |
|
11/13/95 |
2.25 |
Bill of Materials |
|
11/14/98 |
1.00 |
Bill of Materials |
|
2/19/96 |
2.00 |
Work on bench for fuselage layout |
|
2/21/96 |
3.00 |
Finish bench. Started layout on table |
Discrepancy on the plans 166 1/32 inches to station 8
doesn't match with lower station measurements it is 9/16" off. |
2/22/96 |
2.50 |
Finish layout of drawing |
|
5/14/96 |
2.25 |
Receive metal from Dillsburg aeroplane works. All metal
received per the packing list |
Photo1 Photo2 |
5/15/96 |
3.00 |
Rosette weld forward longeron at station 2 and upper at station 1 |
|
5/16/96 |
5.00 |
Cut crosstubes for left side up to station 5 |
|
5/17/96 |
3.00 |
Cut crosstubes for left side up to station 6 |
|
5/18/96 |
2.00 |
Finish all crosstubes for left side. |
drilled holes for stress relief and fuselage oil |
5/18/96 |
1.00 |
Tack weld left side. Installed upgrade for 125 HP engine in lower
longeron. |
|
5/29/96 |
5.00 |
Layout right side installed reinforcement for 125 HP engine in
lower longeron |
|
6/8/96 |
4.00 |
Layout right side to station 4 |
Photo |
6/9/96 |
2.00 |
Layout right side to station 8 |
|
6/23/96 |
5.00 |
Finish right side layout drilled holes and tack weld. |
|
6/29/96 |
1.00 |
Cut bench to layout the bottom of fuselage |
|
6/30/96 |
2.00 |
Layout bottom and put right side on the bench |
|
6/30/96 |
1.00 |
Install1X.049 for 125 HP upgrade in 1 1/8" tube at lower
station 2 |
|
7/3/96 |
4.00 |
Finish layout of bottom and start on top crosstubes |
|
7/5/96 |
3.00 |
Layout top and bend tube for top of back seat |
|
7/7/96 |
1.00 |
Tack weld bottom |
|
7/8/96 |
1.50 |
Cut top tubes and drill holes for stress and oil |
|
7/9/96 |
2.50 |
Fit tailpost and tack top tubes |
|
7/10/96 |
5.00 |
Finish top tube layout and took out of jig |
|
7/11/96 |
3.00 |
Installed tubes at front from top station 1 to lower station 2 for
125 HP upgrade. |
|
7/12/96 |
8.00 |
Weld joints |
|
7/14/96 |
2.00 |
Weld joints and start on landing gear fittings |
|
7/16/96 |
1.00 |
Weld joints and work on landing gear |
|
7/17/96 |
2.00 |
Weld joints and work on landing gear |
|
7/18/96 |
3.00 |
Landing gear upper shock struts |
|
7/21/96 |
2.00 |
Landing gear upper shock struts |
|
7/22/96 |
1.00 |
Landing gear upper and lower shock struts |
|
7/28/96 |
2.00 |
Cut cabane strut mounts |
Photo |
7/29/96 |
1.00 |
Make template for metal mounts |
|
8/27/96 |
2.00 |
Make rear landing gear mounts |
|
9/1/96 |
3.00 |
make front mounts for landing gear and mount on fuselage finish
front landing gear mount |
|
9/4/96 |
1.00 |
Weld right rear landing gear fitting |
|
2/28/97 |
1.5 |
Work on tail wheel mount |
|
2/29/97 |
1 |
Work on stabilizer mount |
|
3/22/97 |
1.5 |
Weld stabilizer mount |
|
3/22/97 |
1 |
Cut and weld 3/4" square tube for tail wheel mount and tail
wire braces |
|
3/29/97 |
1 |
Cut landing gear axle for shock strut mount |
|
3/31/97 |
1.5 |
Weld doublers in place on landing gear axles |
|
4/1/97 |
|
Purchase wheels off of Tripacer from Carrol Deitz of Rockford IL |
|
4/3/97 |
2 |
Weld cabane for shock strut mount |
|
4/4/97 |
4 |
Work on right side landing gear |
|
4/11/97 |
1.5 |
Redo shock strut. put on the shock cord retainer on
up-side-down |
|
4/17/98 |
3 |
Worked on jackscrew mount. First time Paul came to help on
the airplane. |
|
4/19/98 |
3 |
Finished jackscrew mount. |
made a jig to hold tube while I cut the 4 tubes to the fuselage. |
7/3/98 |
3 |
Mounts for rudder peddles |
|
8/11/98 |
4.5 |
Worked on bird cage for wing mounts |
|
8/18/98 |
4 |
Worked on bird cage for wing mounts |
|
9/1/98 |
4 |
Worked on bird cage for wing mounts tack weld |
|
9/8/98 |
4 |
Finish tubes for bird cage |
|
9/15/98 |
4 |
Weld bird cage |
|
9/16/98 |
5 |
Put in brake mounts and work on elevator bell crank mounts |
|
9/16/98 |
2 |
Took picture of clamp used for elevator bell crank mount |
|
9/16/98 |
1 |
Elevator bell crank assembly |
|
9/22/98 |
3 |
Floor board mounts and rudder peddle mounts weld |
|
9/28/98 |
4 |
Torque tube mounts and aileron stops |
|
10/9/98 |
3.5 |
Finish torque tube mounts and weld |
|
10/13/98 |
2 |
Cut tubes for rudder peddles and weld |
|
10/20/98 |
3 |
Rudder peddle mount straps |
|
10/29/98 |
3 |
Rudder peddle straps and motor mounts for fuselage |
|
11/3/98 |
4 |
Wing mounts for rear |
|
11/7/98 |
3 |
wing mounts for front and rear |
|
12/1/98 |
4 |
Finish brake peddles layout vertical stabilizer and rudder |
|
12/6/98 |
3 |
start vertical stabilizer |
|
12/8/98 |
|
receive metal from wicks aircraft supply |
Misc tubing for horizontal and vertical stabilizer and to redo the
torque tube which I messed up on when I built the firs one |
12/8/98 |
3 |
Build vertical stabilizer and tack weld |
|
12/15/98 |
|
Got AC 20-27D from FAA |
|
12/15/98 |
4 |
Technical counselor Bill Rewey came to look at the project.
suggested we true the axles to correct toe out condition. Worked on landing gear
|
|
1/12/98 |
4 |
Weld left landing gear |
|
1/19/99 |
4 |
started on rudder. Bent outside tube 3/8"x .035 did it
on my knee |
|
1/27/99 |
4 |
rudder layout and tack weld |
|
2/9/99 |
4 |
Measured horizontal stabilizer from cub at Morey airport.
will install the balanced tail surfaces. |
|
2/23/98 |
4 |
layout horiz. stabilizer but could not bend the 1.00" X .035
tube |
|
2/24/98 |
4 |
start on building the new torque tube |
|
2/26/98 |
2 |
weld torque tube |
|
3/2/99 |
3 |
Horizontal stabilizer got a conduit bender to bend 1.00 x .035
leading edge. |
|
3/9/99 |
3 |
Finish layout of horizontal stabilizer |
|
3/12/99 |
3 |
Work on torque tube and horizontal stab. |
|
3/14/99 |
2 |
Torque tube and inner connecting tube. |
|
3/16/99 |
4 |
work on tail surfaces |
|
3/23/99 |
4 |
work on tail surfaces |
|
3/30/99 |
1 |
Made back seat front tube and mounts |
|
4/20/99 |
4.5 |
worked on hinges on the right side horizontal stab and elevator |
|
4/27/99 |
4 |
Horizontal stabilizer weld and work on hinges |
|
5/4/99 |
2 |
Weld hinges on elevator and Horiz. stabilizer |
|
5/11/99 |
4 |
cut and bend control horns for elevator and weld to tube. |
|
5/18/99 |
4 |
measure the degrees of sing for the elevator and weld control horns |
|
5/28/99 |
4 |
Modify the horizontal stab to fit the distance from the rear mount
to the jackscrew mount. |
|
6/1/99 |
3 |
install hinges on rudder and vertical stabilizer |
|
6/22/99 |
4 |
cut door tubes and hinges and work on left landing gear brake mount |
|
6/26/99 |
2 |
weld rudder and horizontal stabilizer |
|
6/29/99 |
5 |
Cut top longeron for the door and weld door tubes and hinges. |
|
7/13/99 |
3.5 |
Cut tubes for step and welded. finished front horizontal stabilizer
mount worked on welding horizontal stabilizer |
Photo |
7/20/99 |
3.5 |
Finished step. work on cleaning up horizontal stabilizer. Cut
stringer clips for side. |
|
07/31/99 |
.25 |
Bought full set of ribs from the Aeromart at EAA |
$250.00 for ribs |
8/3/99 |
2.5 |
Clips for stringer. Tested the new Turner Nibbler.
Works great made a jig for cutting metal of specified widths |
$168.00 for nibbler |
8/10/99 |
1.5 |
fairleed cable mounts for elevator |
|