The exterior wall framing is being put up in preperation to add the Brick siding
Franklin Christian Church
New Building
9/11/01
Run your mouse over the pictures to get a description of each one.  Soon the Brick siding will start to go up.  It will take a little over a month to put the brick siding on.  In the Basement all of the wall framing is up and after the shell and roof (what you see now on the ceiling is just the decking) are done they will start putting drywall up.  You will also start to see the main entrance on the North side of the building start to form up as they dig footers.

The Stairs have been poured on both sides
The new two way drive bridge has been poured and will be drivable in a few weeks
The walk bridge up to where the new entrance will be has been poured