PROJECTS

 

 

HCL Perot Systems (From Dec ‘00 – Present)

I am working as Project manager in Telecom Division.

 

*  PROJECT - BillCare 4.0 (IP Based Unified Billing System, Infranet) (Dec ‘01 – Till date)

Client: Prosten, HKG China

* Environment: H/w: Sun & Pentium O/s: Windows 2000 client and Unix (Solaris) Servers, S/w: C++, Java, JSP, EJB, XML, Tuxedo, CORBA, J2EE, Weblogic, TIBCO, eLink etc.

BillCare 4.0 is the next version of the billing software BillCare from the client. This will be the Unified billing software for various kinds of billing like ISP Telephony, wireless, Video on demand, business transaction and various other applications. It will be a multi-tier configuration with some basic modules like data collection, data mediation, billing accounting, settlement, user accounting management, integrated user service management, business operation management, system monitoring and fraud and dispute management.

The product will be on OO based Design and it will be the advance in features in comparison to PORTAL. The architectural concept will be of INFRANET.

 

Role: Project Manager, Project initiation, conceptualizing, Project Planning, Time Estimation, Scheduling, Project implementation Planning, Analysis, designing, development and implementation, Resource management, Presentations and Wish to get involved in Testing, Integration and acceptance.

 

*  PROJECT - Fleet Tracking cum Location based Services using GPS (Aug ‘01 – Till date)

Client: HCL Perot Systems, NOIDA

*  Environment: H/w: Pentium O/s: Windows 2000, RT-LINUX 3.0 S/w: C++, gcc, JAVA, Forte

The purpose of this project is to design and develop a Fleet tracking cum Location based Services system using the GPS services and GSM technology. The system is able to track the vehicles of a company and plot the location of the particular vehicle on a Central server. The central server is a RT Linux based Machine where the RTLinux module is written in ‘C’, associated LINUX application in C++ and the GUI is developed in Java. The GPS data is simulated using a GPS simulator developed on a Windows NT machine. Another part of this project is to develop an application on the Palm Top in J2ME for mapping the vehicle location. The aim of this project is to develop competency in the Real Time systems (RT-Linux) and development of application on Palm Tops using J2ME. Involves development in C/C++, Java and J2ME.

 

Role: Project Manager, Project initiation, defining the scope and conceptualizing, Project Planning, Time Estimation, Scheduling, Project implementation Planning, Analysis, designing, development and implementation, Resource management, Presentations and Wish to get involved in system Testing, Prototype designing, Assistance for Stack development in future.

 

*  PROJECT - Access control and Management system (Smart Card based solution) (Aug ‘15 – Sept ‘15)

Client: ONGC, India

This was a consultancy project for providing the up gradation of the existing system with the client. The proposed system is the smart card based real time access control and monitoring system. The turnkey solution contains the smart card making machine with the proprietary operating system embedded on the card and the reader. The system will be with multi tier solution having master server at one location and various servers at various regional HQ’s. Every user has the priority-based access to various zones. The other application like various accounts is the future requirement of the same card. Our scope was to prepare the RFP and also to propose the turnkey solution for the ACMS System.

 

Role: Project Consultant, Study of the existing system, Client interaction, Specifying the requirements, making the layout of the solution, Vendor interaction and generation of RFP, Proposing the solution, Estimation and costing, Software development planning, scope and conceptualizing, Project Planning, Time Estimation, Scheduling, Project implementation Planning, Analysis, designing, development and implementation, Resource management, Presentations.

 

 

*  PROJECT - SNMPv2, Network Management System (Agent) (April ‘01 – Till Date)

Client: HCL Perot System (Internal Project)

*  Environment: H/w: IP-III Compatible Manager & Agent O/s: Win NT 4.0, Linux 7.2 S/w: C++, RT-Linux, CORBA, ORBIX, VC++, SDK, DDK, TCP/IP, SoftIce Tools: Nu-Mega, Diamondware, Rational Rose, PVCS Protocols Architectures: SNMP-v2

The purpose of this project is to Design and Develop an SNMP Agent on RT Linux using the SNMP-v2 Stack and Monitoring and Managing the peripherals connected to the terminal on the network. This agent will further expanded to monitor and manage the other elements in the network using RMON/ SIP with the real-time system.

 

The functionality of SNMP stack to be developed is based on SNMPv2 protocol defined in RFC 1905, 1906, 1907, 2578, 2579, and 2580. This will be used to develop the following protocol operations – get, getNext, getBulk, response, set and trap. The application will be using the CORBA as a mediation device in between SNMP stack and the drivers (RT-Linux-7.2). 

 

A test simulator will also be developed to facilitate Simulation & Testing of the stack.

 

Role: Project Manager, Project Planning, Time Estimation, Scheduling, Project implementation Planning, Analysis, designing, development and implementation, Resource management, Presentations and Wish to get involved in system Testing, Prototype designing, Assistance for Stack development.

 

*  PROJECT - IP-Axess (VoIP) (Dec ‘00 – April ‘01)

Client: IPaxess (formerly Data Race, Inc)

*  Environment: H/w: IP Axess VocalWare IP Server (1G/ 2G), P-III Compatible Clients O/s: Win NT 4.0, Win 95/98, Win 2K S/w: OC, C++, VC++, MSDN, MSDUN, SDK, DDK, MFC, WDM, VxD, TCP/IP, SoftIce Tools: Nu-Mega, Diamondware, Rational Rose, PVCS Protocols Architectures: ESP, TCP/IP, CHAP, DES V.42/90, H.329, H.323, RAS

The Company was established in 1983 and develops, markets and distributes high quality VoIP client/server application solutions to a wide variety of industries. The company's management comprises a group of seasoned professionals having decades of experience in the relevant technology and business areas. The company has recently modified the business focus so that it is totally focused on its leading VocalWare IP products.

 

The deliverables are portation of the new Windows 2000 VocalWare IP Client to Windows NT 4.0 for the serial port (RS 232) only.

 

Role: Project Manager, Project Planning, Time Estimation, Scheduling, Project implementation Planning, Analysis, designing, development and implementation, Resource management, Presentations and Wish to get involved in system Testing and Optimization.

 

*  Other In-House Developments:

*  Competency development for IP and Real time Embedded system Domain.

*  Protocol development like H.323, G 729, CHAP, ESP, SS7, VoIP over SS7,

*  IP Based applications and difference between IP v4 and IP v6.

*  NIC based Device driver development.

*  Wireless protocols like WAP, GPRS, wireless LAN using IEEE 802.11 standards,

 

 

Few Past Projects

 

 

Unified Software Solutions Pvt. Ltd., Punjab (From March ‘98 To Nov ‘00)

Worked as Manager – Projects.

 

*  PROJECT - Automised Enterprise Resource planning (A-ERP) & Web Server for E-COM (Jan ‘99 – Aug ‘00)

Client: Vishal Group of Companies, Jalandhar, India

*  Environment: H/w: IBM Netfinity-3000 O/s: Windows NT-4.0 S/w: Oracle-8I, JAVA, C, C++, VC++, TCP/IP Tools: Developer-2000  (FORM 5.0, Report-3), e-Fusion. Also includes the data transfer and integration using FTP and dial-up protocols like TCP/IP, FTP using VSAT

Client is one of the leading Hand Tools industries since last 9 years having works at various locations through out the state and the offices worldwide. The system designed for them is an advanced information and tracking system with ISO standard forms and reports. The company is ISO-9002 (100% EOU).

 

Role: Right from Client interaction, Feasibility study, Project Planning, Cost & Time Estimation, Scheduling, Project Implementation Planning, Resource management, Presentations and meetings, also involved in system Testing and Optimization, system integration, networking, Client server application and installation, Dial-up intraserver configuration and optimization.

 

*  PROJECT - CNC Integrated 7 Diamension Punching Press (June ‘98 – Jan ‘99)

Client: Hindustan Hydraulics Pvt. Ltd., India

*  Environment: H/w: Pentium-I O/s: Unix S/w: C, Turbo Pascal-5, DB-2 Tools: Darley CNC/DNC software, Genesis SCADA SYSTEM, Allen Bradley PLC.

Client is one of the leading manufacturers of CNC & DNC controlled Punch press, shearing and bending machine since last 29 years. Company is one of the top 5 companies manufacturing these machineries. They have the credit of designing the fastest punching machine (220ppm). The company is ISO-9002 (100% EOU).

 

Role: To design and develop the Integration system that simulates the optimum path for the pattern of punch/cut/band. This is done to reduce the movement of the motors with the synchronized control. The design and simulation along with the total load/ time and pressure calculation for the completing the pattern.

 

 

 

*  PROJECT - Atomized Enterprise Resource Planning (A-ERP) & E-Commerce Application (March ‘98 – May ‘99)

Client: GDPA Fasteners (I) Ltd., Jalandhar, India

Environment: H/w: Pentium-III O/s: Windows NT-4.0 S/w: Oracle-8, Developer-2000 (Forms-5), JAVA Tools: FORM 5, Report 3, Designer-2000, Java Script

Accounts and Budgeting, HRP & payroll, Raw material management, Store Management, Production planning & Control, Export Marketing Management, Inventory Management, Export Documentation, Packing and Dispatch, Inspection and reports (ISO-9000), Web Server Configuration.

 

Role: The responsibilities were understanding the existing system, requirement study, system specifications, and system design, coding, testing, training the users and implementing the system. Designing includes preparation of flow charts, DFD’s, SRS, entity relationship diagrams, designing table structures, normalization of tables, defining integrity constraints using Designer 2000. During the implementation were to migrate and convert the data from FoxBASE data files to new tables as per the new structures, and testing the validity of data. Putting the entire Inventory on the Web, Configuring the web server, Web Enquiry management, Enquiry analysis & Ordering process, On-Line Negotiations etc.

Project Manager, Right from Client interaction, Feasibility study, Project Planning, Cost & Time Estimation, Scheduling, Project implementation Planning, Analysis, designing, development and implementation, Resource management, Presentations and meetings & also involved in system Testing and Optimization. Network installation and Data Base Administrating planning.

 

 

*  PROJECT - FFMC Foreign Currency Exchange System (Customized Package) (April ‘98 – Aug ‘98)

Client: Unified Software Solutions Pvt. Ltd., Jalandhar, India

*     Environment: H/w: P-III Server O/s: Windows NT-4.0 S/w: Oracle-8I, JAVA, C, C++, VC++ Tools: Developer-2000  (FORM 5.0, Report-3), VB-5

Software developed for the FFMC (full fledge money changers) for the data maintenance of all the foreign currencies co-ordination the latest rate of the currencies upgraded with the information from the NET hourly. Transaction details, Agent details and commission calculation, Customer details, bill generation etc.

 

Integrated version with the Unified Accounts (Package) is also available.

 

Role: Right from case study & analysis, collecting the information from the FFMC companies taking them into confidence, documentation and complete project plan. System analysis, designing DFD's, Data element details providing the guidelines Programmers and developers, Feasibility study, Project Planning, Cost & Time Estimation, Scheduling, Project implementation Planning, Resource management, Presentations and meetings, also involved in system Testing and Optimization integration.

 

 

Glenayre Inc., Canada (From Nov ‘95 To Feb ‘98)

Worked as Manager – Projects.

 

*  PROJECT – Statewide Paging Circle (March ‘96 – Sept ‘97)

 

Client: Hutcheson Max Telecom Ltd., Punjab, India

*  Environment: H/w: GL-3000 O/s: UNIX S/w: C, C++ Tools: ProComm, MRSS, GPSSR, MTOS

Role: Design and development of Conventional Network Management System using SNMP v1  (GL-N2000 OMC) for Paging Network. RF Planning, Network designing, Transmitter Tuning, Remote Agent Installation and Diagnostics.  Frequency planning and transmitter (VHF & UHF) programming.

 

Other: PCT (Paging Control Terminal) MTOS programming and up gradation as per the customers requirement that includes the integration of the PCT with foreign equipment that includes the OAP Server, Switches and Multiplexers, LAN network for report and logging terminals.

Link establishment along with the transmitter synchronization using GPS (Global Positioning System) Equipments. Network Management system for paging network.

 

Final coverage test for the signal strength along with the transmitting power programming and antenna selection per requirement of the wave pattern according to the required coverage.